Remove Now
Cancle
plastic construction formwork(instead of steel template)

plastic construction formwork(instead of steel template)

FOB Reference Price / Min.Order Quantity : Get Latest Prices

Processing Time:1 Days - 60 Days

Packaging Details: STANDARD EXPORTING PACKAGE

Port: Shanghai / Shenzhen / Qingdao / Ningbo / Other

Payment Terms: L/C , T/T , other

img

Quick Details

  • Type: Plastic Profiles
  • Place of Origin: Shandong, China (Mainland)
  • Brand Name: shicheng
  • convenient operation: Widely used
  • Low energy: High yield
  • size:1220X2440 or 915X1830mm:thickness :8-20mm

new-style PE,PP Fiberglass Mesh Five-Layer Building Formwork/building template

PE,PP &Fiberglass Mesh Five-Layer Building Formwork is made of PE PP, fly ash, calcium carbonate and other fillers.

It is 5 layers, as the picture, outside two green surfaces are PP or PE, using the recycling material, such as the recycled film, package, the reclaimed plastic pipe, barrel and other things!

In the middle it is made by the fly ash, calcium carbonate and the other fillers.

And there are two layer fiberglass net in it!  It made the board have the high intensity, small distortion degree and small expansion coefficient.

The plastic building templates can replace steel templates and bamboo plastic sheet templates. Its advantages are as follows: low cost, light weight, it can continuous use 20 -50 times, Waste material can be re-used to do new building templates!

Qingdao Shicheng Plastic Machinery Co., Ltd.

Business Type:

Main Products:Plastic Sheet Machine,Plastic Pipe Machine,Plastic Board Machine,Plastic Profile Machine,Plastic Extruder

Location:No. 18, Jingsan Road, Beiguan Industrial Zone, Jiaozhou, Qingdao, Shandong, China (Mainland)

Total Employees: 51-100

Year Established: 2006

Top 3 Markets:

Accepted Payment Currency:

Nearest Port:

Average Lead Time:

Overseas Office: No

plastic construction formwork(instead of steel template)