Do you want to remove "electric slickline equipment" from your favorites?
Remove Now
Cancle
Nonstandard customized bevel gear box or reducer
FOB Reference Price / Min.Order Quantity
: Get Latest Prices
Processing Time:1 Days - 60 Days
Packaging Details:
STANDARD EXPORTING PACKAGE
Port: Shanghai / Shenzhen / Qingdao / Ningbo / Other
Payment Terms: L/C , T/T , other
|
Housing:
|
Welding House, Casting House
|
|
Materials:
|
Alloy Steel like, 42CrMo, 18CrNiMo7-6, 17CrNiMo6, 40CrNiMo, 42CrMo4, 40Cr, 35CrMo, 20CrMnMo, 45#, 38CrMoAlA, 34CrNiMo6, 35#; Carbon Steel; Stainless Steel or other materials required by the customer.
|
|
Dimension:
|
Dia:50mm ~ 5000 mm; Height: 10 mm ~ 2000 mm
|
|
Weight:
|
50 kg ~ 100000 kg
|
|
Application:
|
Diggings, Metallurgical equipment, Coke even, Cranes and so on
|
|
Inspection:
|
Chemical composition; UT; MT; Mechanical property; Dimension inspection; CMM test; other inspection request by the customer.
|
|
Standard:
|
GB; ASTM; ASME; DIN; JIS; ISO; BS; API; EN
|
|
Heat treatment:
|
Normalized; Annealed; Quenched; Tempered; Others.
|
|
Q.C. Doc.:
|
Chemical composition report; Mechanical properties report; UT test report; Heat treatment report; Dimensions check report; CMM testing report; or other reports as the customer’s request
|
Our requirements:
1. All packing prepares product for shipment in a manner deemed to be safe, preventing damage or corrosion to product, and satisfying customer requirements.
2. Unpainted surface are to be coated or packaged to prevent corrosion or damage.
3. At a minimum, product will be skidded, blocked, and banded down or constrained in a manner to prevent shifting and undesirable movement in transit.
4. When blocking product it is required that all blocks/ supports be placed under stationary features and will not shift during transit. Straps/Chains from the truck should then be placed over those supports when applicable.
5. Konic Gearbox representative must verify that the load, chains/straps and tarp are assembled in such a way to avoid damage to the product during transit.
| Flow Chart |
Customer's Active |
Our Service |
Days |
| Bofore order, confirm the details and informations |
Send all the information about the products, like the drawings, materials, weight, quantity, technical require, requirements (Products; delivery; price; payment terms) and others. |
1. Transform the drawings let the drawings suitable for the processing.
2. Send the information which the customer needed.
3. Confirm all the details and technical information with our technical person.
4. Send the quotation with all the details, like the delivery, package, payment terms, and other informations. |
1-2 weeks |
| Order confirmation |
Send the order to us. |
Send the signed order and with a PI |
2 |
| Deposit payment |
Do the deposit payment as the PI. |
Send the email once got the deposit. |
3 |
| Start of the production |
1. Waiting for the feedback of the prodcts situation.
2. Give a feedback for the technical or others questions about the products.
3. Arrange the inspetion in person or by the third party. |
1. Send the photos of the products.
2. Give a ETD.
3. Send all the doubt to the customers and got the conformation to the production lines.
4. Send all the reports and waiting for the inspection from customer or the third party inspection.
5. Send the package photos to customer. |
Depends on the types, quality and others informaiton of the products. |
| Delivery after passed quality of the products. |
1. Send the balance of the order to us.
2.Waiting for all the documents and other informations of this orders. |
1. Send the copy of the B/L got from the shipping lines, the invoice, packing list and other documents, and then inform our customer do the payment of the balance.
2. Send the email once got the balance of the orders.
3. Send the full set original shipping documents, the inspection documents to the customers.
4. The ETA and track the shipping lines with the delivery details. |
Depends on the final destination and the way of transportation |
| After-sale service |
Send the requirement to us. |
1. We will give a feedback within 1 work day.
2. Give you a experienced technical support.
3. Supplied the maintaince and repair service.
4. Give you a Emergency Contact Information that you can fine us anytime. |
Any time |
Konic Gearbox (Dalian) Co., Ltd.
Basic Information
Business Type:
Main Products:
Location:
Total Employees:
Year Established:
Trade Information
Top 3 Markets:
Accepted Payment Currency:
Nearest Port:
Average Lead Time:
Overseas Office: No
Company Pictures
Verified Supplier
Credit Check