Remove Now
Cancle
Double door and trolley electric furnace

Double door and trolley electric furnace

FOB Reference Price / Min.Order Quantity : Get Latest Prices

Processing Time:1 Days - 60 Days

Packaging Details: STANDARD EXPORTING PACKAGE

Port: Shanghai / Shenzhen / Qingdao / Ningbo / Other

Payment Terms: L/C , T/T , other

img img

Product Image:

 

Introductions:

One end of the furnace is for feeding, the other end is for exiting. This allows the furnace to operate in a semi-continuous mode enhancing production efficiency. With a maximum temperature of 1000℃ this furnace has a wide range of applications.

Parameter name

Unit

                                              Type

RT3-
105-9

RT3-
150-9

RT3-
180-9

RT3-
220-9

RT3-
250-9

RT3-
270-9

RT3-
280-9

RT3-
300-9

Rated power 

 

KW

105

150

180

220

250

270

280

300

Rated voltage 

V

380

380

380

380

380

380

380

380

Max temperature

1000

1000

1000

1000

1000

1000

1000

1000

Workingtemperature

950

950

950

950

950

950

950

950

Phase number

P

3

3

3

3

3

3

3

3

Furnace Chamber Size (m)

length

mm

1800

2000

2100

2400

3000

2400

2400

2400

Width

mm

900

1000

1050

1500

1500

2000

2000

2000

Height

mm

650

700

750

800

1000

1500

1700

1700

Heat Components Connection method

 

Y

Y

Y

Y

Y

Y

Y

Y

Empty furnace Heating up time

h

≤2.5

≤2.5

≤2.5

≤3

≤3.5

≤3.5

≤3.5

≤3.5

Empty furnace Power loss

KW

≤17

≤32

≤39

≤50

≤60

≤65

≤67

≤70

Temperature-control Accuracy

±1

±1

±1

±1

±1

±1

±1

±1

Furnace Temperature Uniformity

±8

±8

±8

±8

±8

±8

±8

±8

Max Loading Capacity

t

3

4.5

5

7

8.5

9

10

11

Equipment weight

t

5

8

9

13

13

14.5

18

19

 

Panjin Liaohe heat energy equipment factory

Business Type:

Main Products:

Location:

Total Employees:

Year Established:

Top 3 Markets:

Accepted Payment Currency:

Nearest Port:

Average Lead Time:

Overseas Office: No

Double door and trolley electric furnace