Remove Now
Cancle
Custom construction formwork metal products with International welder certificate for sale

Custom construction formwork metal products with International welder certificate for sale

FOB Reference Price / Min.Order Quantity

USD 45.00-166.60 / Set/Sets | 1.00 Set/Sets (Min. Order)

Processing Time:1 Days - 60 Days

Packaging Details: Bubble film, cartons, wooden crates, pallets, individual packaging,Custom construction formwork metal products with International welder certificate

Port: Shanghai / Shenzhen / Qingdao / Ningbo / Other

Payment Terms: , , , ,

img

Our Services

1. Sheet Metal Production Process

For any sheet metal part, it has a certain manufacturing process, so-called process flow. With the difference in the structure of sheet metal parts, the process flow may be different. The process described below is mainly what our factory can do.

 

SVEI.png

 

2. Metal Fabrication Manufacturing Equipment

Our metal fabrication facilities allow us to work on a vast range of work pieces. We are capable of fabricating small to large assembly work including high integrity machined components. 

A. Metal Cutting. We have Amada CNC punching machine, laser cutting machine, and flame cutting machine for sheet metal cutting.

B. Bending. We have 4 sets bending machine, 3 sets for sheet metal, 1 set for heavy steel.

C. Press Riveting. We have 2 sets pressure riveting machine to realize the reliable connection of two parts.

D. Welding. We have 4 welding platforms, 1 welding robot, 2 sets of welding rotators, 6 EN certified welder.

E. Painting. We have our own painting line that meets the environmental requirements of the government, to provide one-stop metal fabrication for customer’s different requirements.

F. Inspection Equipment. We have quality inspection process in accordance with ISO9001:2008.

Shanghai Svei Electric Co., Ltd.

Business Type:Manufacturer, Trading Company

Main Products:Sheet Metal Fabrication

Location:Shanghai, China (Mainland)

Total Employees: 101 - 200

Year Established: 2003

Top 3 Markets:

Accepted Payment Currency:

Nearest Port:

Average Lead Time:

Overseas Office: No

Custom construction formwork metal products with International welder certificate for sale