Remove Now
Cancle
5 Gallon Bottle Water Production Line

5 Gallon Bottle Water Production Line

FOB Reference Price / Min.Order Quantity : Get Latest Prices

Processing Time:1 Days - 60 Days

Packaging Details: STANDARD EXPORTING PACKAGE

Port: Shanghai / Shenzhen / Qingdao / Ningbo / Other

Payment Terms: L/C , T/T , other

img

Description
The production line is designed for 3-5 gallon barrels with drinking water production, model 120, 240, 300, 450, 600, 900, 1200. The series Bottled processing system from Washing, filling, sealing consists of three parts.
Washing machines use multi-washing liquid and spray disinfectant spray, to washing, disinfection of the purpose of disinfection liquid can be recycled.

Sealing machine can automatically sealed delivery process mouth with a cap-leaching device to ensure that the cap sterile clean.
This series of production lines are automatically washing, disinfection, filling, Gland, count and output. A functional and modern design, high degree of automation, the machine is set, electricity, gas in one of the new Bottled drinking water equipment.
 
 
 Including related items as below:
1, Reverse Osmosis system (imported flimtec menbrane, high efficiency CNP pump)
2, Automatic Caps (Lid) pulling machine
3, Automatic Empty bottle Exterior brush washer
4. Automatic Empty bottle loader
5. Automatic 5 gallon bottle Automatic inside Rinsing /Filling/Capping Machine
6. Automatic Caps cleansing and dosing system
7. Automatic Caps sleeve shrinking sealing machine
8.Air compressor system for the filling line (Piston type Non-oil LP air compressor)
 
Processing item:
 Pure water,Mineral water

 

5 Gallon Bottle Water Production Line

Jiangmen Living Drinking Water Equipment Co., Ltd.

Business Type:

Main Products: drinking water equipment,sea water desalination,beverage packing equipment,filling machinery,water vending machine

Location: Axle A-E, 10-11, 2/F, No. 4, Fengyu Road, Fengle Garden, Pengjiang District, Jiangmen, Guangdong, China (Mainland)

Total Employees:

Year Established: 2010

Top 3 Markets:

Accepted Payment Currency:

Nearest Port:

Average Lead Time:

Overseas Office: No

5 Gallon Bottle Water Production Line