Do you want to remove "electric slickline equipment" from your favorites?
Remove Now
Cancle
3D panel structure and construction
FOB Reference Price / Min.Order Quantity
: Get Latest Prices
Processing Time:1 Days - 60 Days
Packaging Details:
STANDARD EXPORTING PACKAGE
Port: Shanghai / Shenzhen / Qingdao / Ningbo / Other
Payment Terms: L/C , T/T , other
3D panel structure and construction
3D Panel Wall Structure
Foamed polystyrene insulating layer with the thickness of 100m/m in the center, steel wire truss coated with zinc of 3m/m (3.8mm) between the insulating layer is pinned at 2 intervals, at both sides of which forms up at 5cm × 5cm (5cm × 10cm) intervals with the wire mesh coated with zinc of 3m/m (3.8mm) that is at fine-spun 50m (100m) intervals. So the whole points of contact in all steel wires is joined in a spot welding, which is a panel of 2.4m (4m) full length, 1.2m width, 60~200m/m thickness.
At the first time, it will be sprayed or hand plastered on the both sides in a thickness of 7m/m ~10m/m, and finished with first coat and double second coat of 35m/m ~ 30m/m thickness, which produces the structure with the total thickness of 12cm ~ 13cm, the self-load of 120kg/m2, and the strong earthquake proofing.
Construction of 3D Panel Wall System
- After setting up the fixed metallic materials upon the foundation concrete, the panel is to be in- between stabilized.
- Tie up the connecting line of #22, every kind of strengthened mesh between concrete and panel, panel and panel.
- Lay under the ground the essential electrical pipes and all types of arrangements pipe.
- Finish with the examination to the assemblage, horizontality and verticality, reinforcement and pipe arrangement status.
- Finish the global body with the first time mechanism of spraying cement mortar, and with the second time hand plastering of skimming coating.
- It can be finalized with every type of materials in correspondence to its usage like pitching, tiling, marbling, paper hanging, painting.
- If used for more than second floor building, the construction procedure is like this: 1 assemble the lower part wall, 2 lay down the foundation concrete, 3 assemble the upper part wall, 4 mechanical plastering on the lower part, 5 spraying after laying down the foundation concrete on the upper part.
Anping No.1 Welded Mesh Panels Factory
Basic Information
Business Type:
Main Products:welded wire mesh panel
Location:
Total Employees:
Year Established:
Trade Information
Top 3 Markets:
Accepted Payment Currency:
Nearest Port:
Average Lead Time:
Overseas Office: No
Company Pictures
Verified Supplier
Credit Check