Do you want to remove "electric slickline equipment" from your favorites?
Remove Now
Cancle
Transformer Plant Design
FOB Reference Price / Min.Order Quantity
USD
1.00-1.00
/ Set/Sets |
1.00 Set/Sets (Min. Order)
Processing Time:1 Days - 60 Days
Packaging Details:
STANDARD EXPORTING PACKAGE
Port: Shanghai / Shenzhen / Qingdao / Ningbo / Other
Payment Terms: L/C , T/T , other
Transformer Plant Design
We will be willing to provide whole-process engineering consulting services for you:
Preparing feasibility study report or Proposal
Engineering base Design
Engineering detail Design
Engineering management & consulting
EPC Engineering
CNME has formed an experienced technical staff for the related business. In the past decade, CNME has developed about 100 patents and know-how techniques for the design and engineering of heavy duty workshops, high voltage power transmission and distribution systems, diesel generation stations, high voltage and mass capacity test laboratory, large and high air-conditioned workshops, environmental protection and control, special electrical engineering equipments, industrial kilns and furnaces, engineering survey and petrology, power supply and distribution of bulk cargo terminals and so on. Therefore, CNME has been honored with lots of awards from the state, ministry and province authorities for the up-to-date technology and excellent projects.
CNME Intermational Co.Ltd
Basic Information
Business Type:Trading Company
Main Products:Generation Stations, Electrical Engineering Equipment, Electrical Lab Design And Solution, Power Plant Design Factory, China-cnme
Location:
Total Employees:
Year Established:
Trade Information
Top 3 Markets:
Accepted Payment Currency:
Nearest Port:
Average Lead Time:0
Overseas Office: No
Company Pictures
Verified Supplier
Credit Check