Do you want to remove "electric slickline equipment" from your favorites?
Remove Now
Cancle
GN-HTP Thermoplastics Zebra Crossing Marking Machine
FOB Reference Price / Min.Order Quantity
: Get Latest Prices
Processing Time:1 Days - 60 Days
Packaging Details:
STANDARD EXPORTING PACKAGE
Port: Shanghai / Shenzhen / Qingdao / Ningbo / Other
Payment Terms: L/C , T/T , other
.jpg)
1、Mainly used for zebra crossing jobs of motorway, city road and parking place.
2、The integration design of marking bucket and paint bucket, hanging inside of chassis frame. The outlet bottom-knife adopt double closing device. The bottom-knife seal is tight and drip-proof. Alloy steel screeding structure bottom knife, tungsten alloy cutter head, anti-stick and abrasion-resistance. Ensure the marking line smooth and straight.
3、Through the gear transmission, sowing roll will scroll broadcasting. Ensure the beads more uniform and save.
4、Adopting strong wield frame chassis, surface will be treated by chromium plating, zinc plating or high temperature resistant spraying. Allocate high speed bearing and ensure the whole machine light and flexible.
5、Allocating high temperature resistant(350℃)and abrasion resistant special modified rubber wheels which diameter is φ200mm, It can efficiently prevent the rubber wheel deformation due to long time high temperature working.
6、Through heat-resistant and pressure-proof rubber hose, 15kg LPG tank supply the LPG to the front and back two rows nozzle and firing gun separately. The fire can be controlled by valve. The valve and nozzle both are imported from famous manufacturers.
Shanghai Geny Highway Facilities Co., Ltd.
Basic Information
Business Type:
Main Products:
Location:Room 201, Bldg. 2, No. 600, Linheng Road, Pudong New Area, Shanghai, China (Mainland)
Total Employees:
Year Established: 2005-07-05
Trade Information
Top 3 Markets:
Accepted Payment Currency:
Nearest Port:
Average Lead Time:
Overseas Office: No
Company Pictures
Verified Supplier
Credit Check